Skip to content

Proposals & estimates

Proposal software for subcontractors who'd rather be building

Build a clean, professional proposal from line items, send it in minutes, and when you win, turn it into a project with one click. No retyping.

No credit card required. Then $25 per user per month (2-user minimum).

Win more bids with less office time

  • Line-item proposals. Price by scope, area or system so the GC can compare apples to apples.
  • Reusable templates. Start from your standard scope, terms and exclusions instead of a blank page.
  • Send in minutes. From the office or the truck, on web, iOS or Android.
  • One-click project. A won proposal becomes a project; change orders and billing build on it.

Proposal checklist

Before you hit send, make sure your proposal states:

  • Drawings, specs and addenda you priced (with dates)
  • Scope by line item with prices
  • Inclusions and exclusions
  • Qualifications and assumptions
  • How long the price is valid
  • Payment terms and retainage
  • Acceptance signature block

Exclusions that protect your margin

These scope gaps most often turn into unpaid work for specialty contractors. If you didn't price them, say so. If they're added later, they become a change order.

Common exclusionWhy it matters
Permits and feesOften assumed to be "by others" until the inspector shows up
Cutting, patching and paintingFalls between trades on renovation work
Firestopping at penetrationsFrequently specified under a separate section
Equipment pads, supports and access panelsInterface items between trades
Temporary power, heat and protectionUsually general conditions, not a trade cost
Overtime, after-hours or phased workOccupied buildings and shutdown windows cost more
Bonds and special insurancePrice as a separate add if required

Need submittals prepared after you win?

Our sister company SubmittalShop prepares construction submittals and MEP shop drawings for subcontractors in every CSI division.

Frequently asked questions

What should a subcontractor proposal include?

Your company and contact details, the project name and the bid documents you priced (drawings, specs and addenda), a line-item scope with prices, clear inclusions and exclusions, qualifications, schedule assumptions, payment terms and an acceptance signature.

Why list exclusions on a proposal?

Exclusions show exactly what you did not price, such as permits, cutting and patching, firestopping, temporary power or after-hours work. Clear exclusions prevent disputes and give you the basis for a change order if that work is added later.

What happens after a proposal is accepted?

In Sub-Office you convert the accepted proposal into a project in one click, without re-entering anything, so change orders and pay applications start from the same numbers.

How much does Sub-Office cost?

$25 per user per month with a 2-user minimum. Every plan includes proposals, change orders, pay applications, invoices, daily logs, timesheets and the mobile app. The first 30 days are free and no credit card is required.

Spend less time on paperwork and more time building.

Try Sub-Office free for 30 days. No credit card required, cancel anytime. Then $25 per user per month.

Start your free trial