Skip to content

For drywall, framing & ceiling contractors

Software for drywall and framing contractors

Bid by floor or area, track the layout changes and backing requests that eat your margin, and bill framing, board, finish and ceilings on schedule.

No credit card required. Then $25 per user per month (2-user minimum).

Protect your margin on every floor

  • Area-based billing. Schedule of values by floor and stage, so percent complete is easy for the super to verify.
  • Layout changes priced. Moved walls, added soffits and backing become change orders with approval tracking.
  • Field proof. Daily logs and photos document out-of-sequence work and damage by others.
  • Crew time. Timesheets by project from the mobile app.

See how progress billing and change orders work in Sub-Office.

Example drywall & framing schedule of values

LineScheduled value
Mobilization & submittals$5,000
Level 1: framing$24,000
Level 1: hang$18,000
Level 1: tape & finish$16,000
Level 1: acoustical ceilings$14,000
Level 2: framing, hang, finish & ceilings$70,000
Punch & closeout$3,000
Contract total$150,000

Build yours with the free pay application template.

Drywall change orders worth tracking

Layout changes

Moved or added walls after framing starts, including demolition of installed work.

Backing & blocking

In-wall backing for TVs, grab bars, casework and equipment added after the bid.

Assembly upgrades

Added fire-rated, acoustic or impact-resistant assemblies, or higher finish levels.

Out-of-sequence work

Return trips because other trades weren't ready. Log dates and photos.

Patching for others

Repairs after other trades cut into finished walls.

Soffits & bulkheads

Added to hide ductwork or piping that didn't fit above the ceiling.

Price one now with the free change order form.

Frequently asked questions

How should a drywall contractor set up a schedule of values?

Most drywall and framing contractors bill by area and by stage: for example, each floor broken into framing, hang, tape and finish, and ceilings, plus mobilization, insulation if in scope, and closeout. Matching the GC's area breakdown makes percent complete easy to verify.

What causes the most drywall change orders?

Layout changes after framing starts, added in-wall backing for other trades' equipment, upgraded finish levels, added rated or acoustic assemblies, out-of-sequence work, and patching after other trades.

How do I handle patching for other trades?

Treat it as extra work unless your contract includes it. Log each request with photos and the trade responsible, then price it as a change order or back-charge request.

Can crews log hours from the job?

Yes. The Sub-Office mobile app includes daily logs, photos, crew hours and timesheets.

Spend less time on paperwork and more time building.

Try Sub-Office free for 30 days. No credit card required, cancel anytime. Then $25 per user per month.

Start your free trial